HomeProduct › AI EOT Claim Drafting
Product · Claim draft wizard

AI drafting where nothing appears that you did not supply.

Five steps in, one structured claim out: contractual basis, facts, cause and effect, time impact, cost reservation, annexures. Every sentence traceable to an input, every gap marked, every page stamped draft for expert review.

5 steps
Contract basis, events, evidence, time impact, generate
8 sections
Introduction to annexure list, in your family's structure
[GAP]
What the draft writes when something is missing, instead of guessing
THE RULES THE MODEL RUNS UNDER

Why an AI draft can be trusted as a starting point

The objection is fair: nobody should trust a robot with a claim worth crores. So the drafting engine is fenced in, and the fences are the product.

01

Only supplied facts

The system prompt permits only the dates, events, clause references, and evidence you entered in the wizard. It cannot state a fact you did not give it.

02

Inline evidence citations

Each factual sentence cites the evidence reference it was built from, in the form (E-041), and the annexure list is assembled from those references automatically.

03

Gaps, not guesses

Where a fact needed for a paragraph is missing, the draft inserts a bracketed gap describing what is needed. Where two inputs conflict, it flags the conflict rather than picking one.

HOW IT WORKS

The five-step wizard

StepWhat you doWhat the engine does
1. Contract basisTick the EOT grounds you rely on from the confirmed extractionCarries the confirmed clause references into the draft
2. EventsSelect one or more delay events from the registerBuilds the chronology from event and awareness dates
3. EvidenceCheck linked evidence and the gap checklist, attach moreAssigns reference numbers and prepares the annexure list
4. Time impactEnter affected activities, days claimed, and a short explanation per eventWrites the time impact section from your figures only; no programme parsing in the current version
5. GenerateReview the draft, edit in the rich-text view, exportProduces the structured claim with the draft-for-expert-review banner on every page
WHAT COMES OUT

A working document set, not a chat answer

D1

Claim narrative

Introduction, contractual basis, statement of facts, cause and effect, time impact, reservation regarding cost or a prolongation cost section, conclusion, annexure list.

D2

Notice status check

Every included event graded as served in time, window open, or window closed, with dates shown. A time-barred event is never dressed up as compliant.

D3

Evidence gap list

Which of the thirteen evidence categories are covered for each event and which are missing, so site can be tasked while records can still be created.

D4

Word and PDF export

Company letterhead text, numbered paragraphs, and an annexure list that matches the evidence locker. Word-safe fonts so it opens identically on the Engineer's machine.

PHASE 2 MODULES

Already built for customers who asked

A

Prolongation cost

Site establishment, idle plant, staff retention, and other direct costs entered line by line. Overhead formulas (Hudson, Emden, Eichleay) are offered as options for your expert to choose, never calculated by the app.

B

Rebuttal assistant

Upload the Engineer's rejection. Each ground is mapped to existing facts and evidence or marked as needing new evidence, and a response letter is drafted in the same register.

C

Bilingual output

English and Arabic side by side for KSA and Qatar facing submissions, with the English version stated as prevailing and the draft banner in both languages.

AI DRAFTING · FREQUENTLY ASKED

Asked in every first call

Will an AI-drafted claim survive scrutiny from the Engineer?
The draft is the starting point, not the submission. Nothing appears in it that you did not supply, every paragraph shows its source record, and your expert reviews, strengthens, and signs before anything is issued. That is the only basis on which we sell it.
Which AI model touches our documents?
Drafting runs through a single server-side function calling a third-party language model API; the key never reaches the browser. We disclose the processing chain plainly when asked, project by project, and your text is not used to train shared models.
Can it read our Primavera programme?
Not in the current version. Time impact uses the dates and durations you enter, and you can attach programme extracts as evidence. XER parsing is on the roadmap and will be funded by revenue, not promised early.
What if the notice was already late?
The wizard says so. A time-barred event carries an expert-review-required flag, the status chip stays red, and the narrative preserves your position without asserting compliance that did not happen.
CERTIFICATIONS OF CONDUCT

Why you can put your name near it

Draft for expert review

DraftMyEOT is not a law firm and never claims to be. Every output is a draft, built to be reviewed and signed by your contracts lead or consultant.

Nothing invented, ever

No dates, events, or clause numbers appear that you did not supply. Every paragraph shows the evidence reference it was built from.

Your data, walled off

Each company's workspace is isolated, documents sit in private storage, and consultants see only the project they were invited to.

Issue one project for a draft

Send a contract, your delay events, and whatever records exist, tidy or not. A structured draft comes back in 48 hours. Not useful? Keep it, owe nothing.

Project
Your delayed project, any stage
Deliverable
EOT claim draft · notice status check · evidence gap list · annexure pack
Rev / Status
REV A · DRAFT FOR EXPERT REVIEW
Issued within
48 hours

Sources

  1. Society of Construction Law, Delay and Disruption Protocol, 2nd Edition (February 2017)
  2. “No Notice, No Claim? Conditions Precedent in FIDIC Contracts,” Howard Kennedy