Proof, not promises. Upload the contract, your delay events, and whatever records exist, tidy or not. Within 48 working hours you receive a claim draft, a notice status check, an evidence gap list, and an annexure pack. If it is not useful, keep it and owe nothing.
General Conditions, Particular Conditions, amendments and side letters. Scans are fine; text PDFs are faster.
A list, an email, or a call. Event dates, when you became aware, who caused it, what it affected. Rough is fine.
Site diaries (photos of handwritten pages work), WhatsApp exports, letters, RFIs, minutes, photos, programme extracts.
Any notices already issued, so the status check reflects what actually happened rather than what should have.
3.1 The Contractor submitted RFI-208 on 12 May 2026. Revised drawing A-1204 Rev C was issued on 09 June 2026, twenty-eight days later, during which the works to Level 12 could not proceed for reasons not attributable to the Contractor.
Your documents land in an isolated workspace. The contract is extracted and every notice rule confirmed against your actual wording.
ProfiledEvents logged with both dates, evidence filed and referenced, gaps listed. The draft engine produces the first structured narrative.
FiledA named claims professional reads the draft before it leaves. No draft leaves without that review, ever.
ReviewedWord and PDF, with annexure pack and status check, delivered inside 48 working hours with a short note on what to fix first.
IssuedEvery output passes a named expert before it reaches you. Every page carries a draft-for-expert-review banner, and we say it out loud in every call.
At that stage you need forensic delay experts and counsel. We will say so and, where we can, point you to one.
If a date, clause, or record is missing, the draft says so in square brackets. It does not fill the hole with something plausible.
Your project is never used in marketing without written permission. Testimonials are anonymised unless you choose otherwise.
DraftMyEOT is not a law firm and never claims to be. Every output is a draft, built to be reviewed and signed by your contracts lead or consultant.
No dates, events, or clause numbers appear that you did not supply. Every paragraph shows the evidence reference it was built from.
Each company's workspace is isolated, documents sit in private storage, and consultants see only the project they were invited to.
Send a contract, your delay events, and whatever records exist, tidy or not. A structured draft comes back in 48 hours. Not useful? Keep it, owe nothing.