One workspace for the whole life of a delay: the contract rules, the register, the deadline clock, the evidence, the notice, and the claim draft. Built for contractors, not for the employer's document control system.
Aconex or Procore holds the letters. Primavera holds the programme. Excel holds the register, started late. WhatsApp holds the photos. Word holds last year's claim as a template. None of them talks to the notice clock.
Contract family selected, documents uploaded, notice periods and LD terms extracted with quoted wording and confirmed by you.
Event date, awareness date, cause, responsible party, status workflow, continuing-delay toggle, and hindrance register export for Indian projects.
Calendar or working-day counting, weekend profiles per country, editable holidays, email alerts, colour-coded countdowns with red reserved for warnings.
Per-event uploads with auto reference numbers, WhatsApp import, diary photo transcription, bulk correspondence import, and a gap checklist.
Family-correct letters and eight-section claim drafts, exported to Word and PDF with a draft-for-expert-review banner.
Invite an external reviewer to one project, with comments and review status, and nothing else visible.
| Plan | Price | What is included |
|---|---|---|
| 48-hour draft (pilot) | USD 750 | One delayed project's records in, one structured EOT claim draft back in 48 hours. First 2–3 logos run free for a testimonial. |
| Per-claim standard | USD 1,500–2,500 | Claim narrative, notice history check, evidence gap report, one revision round |
| Company Annual | USD 6,000–12,000/yr | Unlimited projects and users, deadline engine, notice letters, evidence locker, 4 claim drafts included. Extra drafts USD 900 each. |
| Enterprise / group | From USD 20,000/yr | Multi-entity, single-tenant hosting option, priority drafting SLA |
| Plan | Price | What is included |
|---|---|---|
| 48-hour draft (pilot) | Rs 25,000 | One package's records in, one structured EOT application draft back in 48 hours |
| Per-claim standard | Rs 50,000–1,00,000 | Claim narrative, notice history check, evidence gap report, one revision round |
| Company Annual | Rs 2,40,000–4,80,000/yr | Hindrance register, deadline engine, and 4 drafts included, sold per company, unlimited users |
| Per-project | Rs 60,000–1,00,000/yr | Matches how Indian contractors budget: project-wise rather than company-wise |
DraftMyEOT is not a law firm and never claims to be. Every output is a draft, built to be reviewed and signed by your contracts lead or consultant.
No dates, events, or clause numbers appear that you did not supply. Every paragraph shows the evidence reference it was built from.
Each company's workspace is isolated, documents sit in private storage, and consultants see only the project they were invited to.
Send a contract, your delay events, and whatever records exist, tidy or not. A structured draft comes back in 48 hours. Not useful? Keep it, owe nothing.