EOT claim software for UAE contractors, Dubai to Abu Dhabi.

Built for the way UAE projects actually run: heavily amended FIDIC forms, a Saturday-Sunday working week, Aconex-style correspondence you already keep, and a notice clock that started the day the delay did.

Sat–Sun
UAE working week, built into every deadline calculation
$138B
Confirmed, execution-ready project pipeline across the UAE, roughly 700 projects
48 hrs
Turnaround on a structured, expert-reviewable EOT draft
THE UAE DESK

What a Dubai contracts manager is actually up against

The largest confirmed pipeline in the GCC produces disputes at scale, and the UAE's own courts have read FIDIC notice clauses strictly. The DIFC Court of Appeal treated Sub-Clause 20.1 as a condition precedent in 2022, and the Privy Council did the same in January 2026.

A LOGGED EVENT, UAE-STYLE

What a Dubai subcontractor's register entry looks like

Illustrative example, not a real client record.

Served in time

Delay Event 03: Late issue of construction drawings, Level 12

RFI-208 submitted 12 May 2026. Revised drawing A-1204 Rev C issued 09 June 2026, twenty-eight days later. Notice under the contract's amended Sub-Clause 20.1 (21 days from awareness per PC-14) issued on day 9. Works to Level 12 could not proceed for reasons not attributable to the Contractor.

SOURCE · E-041 RFI-208 · E-047 TRANSMITTAL T-1188 · E-052 SITE DIARY 12 MAY TO 09 JUN
HOW IT WORKS

Four steps, each one stamped

N1

Upload the contract

Notice periods, time-bar wording, and LD terms extracted with the quoted clause; Particular Conditions diffs shown against the family baseline.

Profiled
N2

Log delays from site

Event date and awareness date captured separately; diary photos and WhatsApp exports become dated, referenced evidence.

Filed
N3

Guard every window

Deadlines counted in the project's own working week; alerts at 7, 3, and 1 days to every admin and contracts manager.

Served in time
N4

Draft for review

Family-correct claim or notice drafted from your inputs only, exported to Word and PDF with a draft-for-expert-review banner.

Issued
FIDIC 1999 RED / YELLOWFIDIC 2017BESPOKE UAE EMPLOYER FORMSBACK-TO-BACK SUBCONTRACTSAED AND USDSAT–SUN CALENDAR
PRICING · UAE

From a USD 750 pilot to a company-wide annual plan

PlanPriceWhat is included
48-hour draft (pilot)USD 750One delayed project's records in, one structured EOT claim draft back in 48 hours. First 2–3 logos run free for a testimonial.
Per-claim standardUSD 1,500–2,500Claim narrative, notice history check, evidence gap report, one revision round
Company AnnualUSD 6,000–12,000/yrUnlimited projects and users, deadline engine, notice letters, evidence locker, 4 claim drafts included. Extra drafts USD 900 each.
Enterprise / groupFrom USD 20,000/yrMulti-entity, single-tenant hosting option, priority drafting SLA

See the full pricing breakdown →

UAE · FREQUENTLY ASKED

Asked in every first call

Is our data stored in the UAE?
We state the hosting region plainly before you commit, and single-tenant hosting is available as a premium option for clients with stricter residency requirements. Ask and you will get a direct answer, not a brochure.
Our main contractor pushes shorter notice windows down to us. Can one event track both?
Yes. A back-to-back subcontract profile spawns two linked clocks for the same event: the upstream deadline to notify the main contractor and the downstream deadline that preserves your own rights.
We do not want to look claim-hungry to the employer.
Quiet mode keeps deadline tracking and evidence filing fully active while letter and claim generation stays manual-trigger only. You stay ready without sending anything until you decide to.
Can we invite our claims consultant?
An admin can invite an external consultant to exactly one project. They can read the register, evidence, and claims, comment on drafts, and change review status. They see nothing else in your company, and revoking the invitation cuts access instantly.
CERTIFICATIONS OF CONDUCT

Why you can put your name near it

Draft for expert review

DraftMyEOT is not a law firm and never claims to be. Every output is a draft, built to be reviewed and signed by your contracts lead or consultant.

Nothing invented, ever

No dates, events, or clause numbers appear that you did not supply. Every paragraph shows the evidence reference it was built from.

Your data, walled off

Each company's workspace is isolated, documents sit in private storage, and consultants see only the project they were invited to.

Send your next UAE project

Send a contract, your delay events, and whatever records exist, tidy or not. A structured draft comes back in 48 hours. Not useful? Keep it, owe nothing.

Project
Dubai or Abu Dhabi project, any contract family
Deliverable
EOT claim draft · notice status check · evidence gap list · annexure pack
Rev / Status
REV A · DRAFT FOR EXPERT REVIEW
Issued within
48 hours

Sources

  1. “Construction Arbitration: United Arab Emirates,” Global Arbitration Review
  2. “How FIDIC Claims Work in the UAE,” Kayrouz & Associates (2026)
  3. “FIDIC time bar bites: Privy Council holds clause 20.1 is a condition precedent,” Charles Russell Speechlys (2026)
  4. Abu Dhabi Chamber, Construction Sector study, as reported by Binayah