Indian government contracts run on hindrance registers, protective letters, and Authority Engineer countersignatures. The workspace keeps all three linked to the events they protect from day one, then drafts the EOT application in the format the AE expects.
On highway packages the record that decides an arbitration is written in the first weeks of a hindrance, not in the years before the hearing. Most contractors reconstruct it later, which is why the Authority so often out-documents them.
Illustrative example, not a real client record.
Land parcel at Ch. 42+300 to 44+100 not handed over as of scheduled date. Hindrance logged in register 03 February 2026, notice issued to Authority Engineer 08 February 2026, within the contract's notice window. Land handover completed and hindrance closed 22 April 2026, a period of 78 days.
Notice periods, time-bar wording, and LD terms extracted with the quoted clause; Particular Conditions diffs shown against the family baseline.
ProfiledEvent date and awareness date captured separately; diary photos and WhatsApp exports become dated, referenced evidence.
FiledDeadlines counted in the project's own working week; alerts at 7, 3, and 1 days to every admin and contracts manager.
Served in timeFamily-correct claim or notice drafted from your inputs only, exported to Word and PDF with a draft-for-expert-review banner.
IssuedNever per seat. Per project when that is how the package is costed; per company when a group wants everything under one plan.
| Plan | Price | What is included |
|---|---|---|
| 48-hour draft (pilot) | Rs 25,000 | One package's records in, one structured EOT application draft back in 48 hours |
| Per-claim standard | Rs 50,000–1,00,000 | Claim narrative, notice history check, evidence gap report, one revision round |
| Company Annual | Rs 2,40,000–4,80,000/yr | Hindrance register, deadline engine, and 4 drafts included, sold per company, unlimited users |
| Per-project | Rs 60,000–1,00,000/yr | Matches how Indian contractors budget: project-wise rather than company-wise |
DraftMyEOT is not a law firm and never claims to be. Every output is a draft, built to be reviewed and signed by your contracts lead or consultant.
No dates, events, or clause numbers appear that you did not supply. Every paragraph shows the evidence reference it was built from.
Each company's workspace is isolated, documents sit in private storage, and consultants see only the project they were invited to.
Send a contract, your delay events, and whatever records exist, tidy or not. A structured draft comes back in 48 hours. Not useful? Keep it, owe nothing.